we have a migration tool install which by default tool C drive. all logs, reports are stored in c drive during migration. Our C drive is full now. So i wanted to check, if there any say to use D drive (which can be scaled as needed) to install and store migration artifacts.
we have some 5 TB data to b moved and migration bcz of no storage in c drive