Jan 17 2024 04:54 PM
Hi,
I have a form with a questions as a checklist on it, but I want to create a planner task for each of the items on the checklist that was not checked off. Below is an example of the checklist:
All of the items that have not been checked need to be completed and so I want them to be created as a planner task once the form is complete to these unfinished items can be addressed.
Is there a way to do this with Flow/Power Automate?