MS365 Project Drawings
We have a strange issue with drawings in MS Project.
We draw a text box and we save the file. if we open the file again the drawing is gone.
If we open the file on a different computer the textbox is showing.
I've uninstalled project but the problem stays.
Is there anyone here who has a suggestion were to look.
Here soms Images with the problem
27 Replies
- Ignacio_MartinSteel Contributor
Veysie,
Does the same thing happen to you if the inserted object is, for example, an arrow?
Ignacio
- VeysieTin Contributor
The Same thing happens with all the Gant Drawings. If i save they disappear.
- Ignacio_MartinSteel Contributor
Veysie,
The idea was to check if there was a problem with the font of the text (Arial for example, by right-clicking on the frame and selecting Font...).
It may be a problem with the graphics management by the device hardware: graphics card, driver, system configuration, ...
Ignacio
- Ignacio_MartinSteel Contributor
Veysie,
Can you attach that example file?
Ignacio
- VeysieTin Contributor
Here is a link for the download
https://we.tl/t-0LeUKlI63w- Ignacio_MartinSteel Contributor
Hello Veysie,
The file you sent works fine on my desktop version, and the text box is displayed after saving and opening.
Other tests:
Save and open the file on your local disk.
Reinstall or repair and update the Ms Project software.
Standard monitor resolution (e.g. 1920x1080).
Clear the Project Cache.
Ignacio
- Ignacio_MartinSteel Contributor
Veysie,
Try associating it with a task.
Ignacio
- VeysieTin Contributor
After saving the textbox is gone..
The strange thing is that i have this with 3 different computers now. But on 2 others everything is showing. 1 pc with project 2019 and 2 with o365 (not showing), other 2 with o365 (showing)
- Ignacio_MartinSteel Contributor
Hi Veysie,
Coluld you show us a screenshot with the Properties after selecting your Text Box object in the Gantt and selecting them in Menu > Gantt Char Format > Drawings > Drawing > Properties ?
Ignacio
- VeysieTin Contributor
Is it this?
- Ignacio_MartinSteel Contributor
Hi Veysie.
The dates do not match.
Please manually enter a date you want to display on the Gantt chart.Ignacio
- VeysieTin Contributor
Ignacio
This is selected but nothing changes.- John-projectSilver Contributor
Veysie,
What happens if you toggle the Tekeningen weergeven option off and on?
Try this. Select the Tracking Gantt view. Add a text box, save the file and re-open. Does the text box appear?
John
- VeysieTin Contributor
John
If i open a document and add a textbox, the textbox is showing. If i toggle then the textbox appears and disappears. Afterwards i save the document and re-open it, and the textbox is not showing but the option is ON. On another laptop with the same version of Project the textbox is showing. So i dont understand it :-)
- Ignacio_MartinSteel Contributor
Hi Veysie,
Try selecting Show Drawings in Menu bar > Gantt Chart Format > Format > Layout
Ignacio