Forum Discussion
Veysie
Nov 25, 2024Tin Contributor
MS365 Project Drawings
We have a strange issue with drawings in MS Project. We draw a text box and we save the file. if we open the file again the drawing is gone. If we open the file on a different computer the textbo...
Ignacio_Martin
Nov 26, 2024Steel Contributor
Veysie,
Try associating it with a task.
Ignacio
- VeysieNov 26, 2024Tin Contributor
After saving the textbox is gone..
The strange thing is that i have this with 3 different computers now. But on 2 others everything is showing. 1 pc with project 2019 and 2 with o365 (not showing), other 2 with o365 (showing)