Forum Discussion
MS365 Project Drawings
Ignacio
This is selected but nothing changes.
- John-projectNov 25, 2024Silver Contributor
Veysie,
What happens if you toggle the Tekeningen weergeven option off and on?
Try this. Select the Tracking Gantt view. Add a text box, save the file and re-open. Does the text box appear?
John
- VeysieNov 25, 2024Tin Contributor
John
If i open a document and add a textbox, the textbox is showing. If i toggle then the textbox appears and disappears. Afterwards i save the document and re-open it, and the textbox is not showing but the option is ON. On another laptop with the same version of Project the textbox is showing. So i dont understand it :-)
- John-projectNov 26, 2024Silver Contributor
Veysie,
Okay but what I said was try toggling the textbox option off and on when you re-open the file and the textbox is not showing initially. Does toggling the option make the textbox appear?
And how about the suggestion to add a textbox to a view other than the Gantt Chart view (i.e. Tracking Gantt view). Does that textbox disappear after saving and re-opening the file? I'm trying to establish if the issue is limited to the Gantt Chart view only.
John