MS365 Project Drawings
We have a strange issue with drawings in MS Project. We draw a text box and we save the file. if we open the file again the drawing is gone. If we open the file on a different computer the textbo...
Ignacio_Martin
Nov 28, 2024Steel Contributor
Veysie,
Does the same thing happen to you if the inserted object is, for example, an arrow?
Ignacio
- VeysieNov 29, 2024Tin Contributor
The Same thing happens with all the Gant Drawings. If i save they disappear.
- Ignacio_MartinNov 29, 2024Steel Contributor
Veysie,
The idea was to check if there was a problem with the font of the text (Arial for example, by right-clicking on the frame and selecting Font...).
It may be a problem with the graphics management by the device hardware: graphics card, driver, system configuration, ...
Ignacio