Forum Discussion
Veysie
Nov 25, 2024Tin Contributor
MS365 Project Drawings
We have a strange issue with drawings in MS Project. We draw a text box and we save the file. if we open the file again the drawing is gone. If we open the file on a different computer the textbo...
Veysie
Nov 26, 2024Tin Contributor
Here is a link for the download
https://we.tl/t-0LeUKlI63w
Ignacio_Martin
Nov 26, 2024Steel Contributor
Hello Veysie,
The file you sent works fine on my desktop version, and the text box is displayed after saving and opening.
Other tests:
Save and open the file on your local disk.
Reinstall or repair and update the Ms Project software.
Standard monitor resolution (e.g. 1920x1080).
Clear the Project Cache.
Ignacio
- VeysieNov 26, 2024Tin Contributor
Ignacio thanks for testing.
Thats the strangest thing indeed. on some pc's it works and some not.
Other tests:
Local disk same problem
Reinstalled Project 2 times en deletet al files in registry and program files but same problem
standard resolution doesnt change anything
In 2019 i dont find a cache and in O365 it isn't checked.