MS365 Project Drawings
We have a strange issue with drawings in MS Project. We draw a text box and we save the file. if we open the file again the drawing is gone. If we open the file on a different computer the textbo...
Ignacio_Martin
Nov 28, 2024Steel Contributor
Veysie,
Does the same thing happen to you if the inserted object is, for example, an arrow?
Ignacio
Veysie
Nov 29, 2024Tin Contributor
The Same thing happens with all the Gant Drawings. If i save they disappear.
- Ignacio_MartinNov 29, 2024Steel Contributor
Veysie,
The idea was to check if there was a problem with the font of the text (Arial for example, by right-clicking on the frame and selecting Font...).
It may be a problem with the graphics management by the device hardware: graphics card, driver, system configuration, ...
Ignacio