Forum Discussion
Veysie
Nov 25, 2024Tin Contributor
MS365 Project Drawings
We have a strange issue with drawings in MS Project. We draw a text box and we save the file. if we open the file again the drawing is gone. If we open the file on a different computer the textbo...
Veysie
Nov 26, 2024Tin Contributor
Is it this?
Ignacio_Martin
Nov 26, 2024Steel Contributor
Hi Veysie.
The dates do not match.
Please manually enter a date you want to display on the Gantt chart.
Ignacio
- VeysieNov 26, 2024Tin Contributor
i'm sorry this was an other document.
Here the properties of e new textbox.
Then i saved the document and re-opened it and the textbox is gone again: