Drew_IsoV
Apr 20, 2021Copper Contributor
Document Versioning
Our Quality Management System requires us to periodically review documents. I am trying to keep track of the review date with a column in the document library, but changing the review date increments the file version.
I really only want the version to change when the contents of the actual file change. Is there any way to change the contents of columns without changing the file version?