Power Automate Flow: Move items from list to planner
Good morning everybody,
I have successfully moved items from my list to a planner that are coming due within the next 6 months; however, I do not know how to make it so that it does not duplicate those items in the planner every day as I have it running every night at 2300. Looking for help, from what I have seen used in other situations is the Union expression but have not been successful at applying it. I have attached a snip of my flow.
Respectfully,
Jesse
- I am new to this, and just figured out a solution. I had the time between to dates as a 6-month time span. All I had to do is change it so that if the list had a date on one day six months from today, it would pull it. This way it only looks at one day a month and not all days in 6 months... I am replying to myself, in case someone sees this post with the same issue, it may help them.
- ADGToreUpBrass ContributorI am new to this, and just figured out a solution. I had the time between to dates as a 6-month time span. All I had to do is change it so that if the list had a date on one day six months from today, it would pull it. This way it only looks at one day a month and not all days in 6 months... I am replying to myself, in case someone sees this post with the same issue, it may help them.