Hello All,
I have a SharePoint list which as several columns. Two of them are date columns.
1-Date revised
2-Next revision date
I have a calculated Next revision date column which shows:
A-) show red if the next revision date is greater than Date revised+1 year
B-) show green for anything else
C-) Show amber if the next revision date is less than today's date-1 month or equal to today's date.
- Thanks rob. I think you almost got it.
It should be like this:
The Next Revision Date=Date Revised+365 days
Date Revised
If the Next Revision date is now()- 30 days : Amber
If the Next Revision date is greater than now() is: Red
Otherwise show it as Green.
- Rob_ElliottBronze ContributorWhat's the formula in your next revision date calculated column?
- NaligurtanBrass ContributorNext revision date=[Revised Date]+365
- Rob_ElliottBronze Contributor
Naligurtan given that your calculated has the next revision date formula as Date revised +365 I don't quite see how your option A) will ever be met because it will never be more than 365 days ahead of the date revised column.
But I've included it in the following JSON which you add in advanced mode and which will handle the other 2 options.
{ "$schema": "https://developer.microsoft.com/json-schemas/sp/column-formatting.schema.json", "elmType": "div", "txtContent": "@currentField", "style": { "background-color": "=if(@currentField <= addDays(@now,0), 'gold', if(@currentField > addDays([$Daterevised],365), 'red','green')", "color": "=if(@currentField <= addDays(@now,0), 'black', 'white')", "padding-left": "10px" } }