Having problem with linking the tasks in project tool
Hi,
I am facing a problem with MS Project tool. I have created different tasks and linked them and put them in different phases. Also, I have given the title or project name at the top of task list. Ideally, every phase should display the duration as per their task list, but it is not happening. The first phase is showing overall duration of the project which is wrong. I have tried linking and unlinking of the tasks several times but in vain. Please help me and guide what wrong I have done.
Thanks in advance..
11 Replies
- Ignacio_MartinSteel ContributorHi,
Can you show a full screenshot please?
Ignacio- mintvivekCopper ContributorHi,
Did you receive the pics? If not, please let me know.- Ignacio_MartinSteel ContributorWere not received
- mintvivekCopper Contributor
For your convenience, I have split the task list in two parts and since I am a beginner, I am not creating a huge task list. Please check the above two screenshots and help me. Thanks.
- Ignacio_MartinSteel Contributor
Hello.
Can you confirm if the tasks are in Auto Scheduled and not Manuallly in the Task Mode column? If not, try putting the phase summary tasks in Auto mode. Precisely the manually scheduled mode is an option that the user can put what he wants without considering the subtasks.
Ignacio- mintvivekCopper Contributor
First of all, thanks for the response and secondly, all the tasks including Summary are in "Auto Scheduled" Mode only.