Forum Discussion

MSohail2400's avatar
MSohail2400
Copper Contributor
Jan 18, 2023

Error On Build Project After Upgrading Finance & Operation Version Dynamic 365

After upgrading version from 10.0.22 to 10.0.30 an error occurred when build the project.

I have installed Visual Studio 2017(Version 15.9.33)

 

I have a single custom model which is integrated with my project. Projects build successfully before upgrade the version. But, after upgrade F&O version this error throws when I build my model.

 

Error1:

The "BuildTask" task could not be initialized with its input parameters.

 

Error2:

The "DeployOnline" parameter is not supported by the "BuildTask" task. Verify the parameter exists on the task, and it is a settable public instance property. 

4 Replies

  • lakhvich's avatar
    lakhvich
    Copper Contributor
    Please find and install the specific version of the D365 extension from the deployable package folder for the current PU version.

    (*K):\DeployablePackages\...
    \\DevToolsService\Scripts\Microsoft.Dynamics.Framework.Tools.Installer.vsix
  • MSohail2400:

    Please update the Finanace and Operations (Dyanmics 365) extension in Visual Studio with relevant D365 F&O version. It solves an issue for me. I have updated with version shown in below screenshot.

    Visusal Studio D365 F&O extension version detail