Forum Discussion
MSohail2400
Jan 18, 2023Copper Contributor
Error On Build Project After Upgrading Finance & Operation Version Dynamic 365
After upgrading version from 10.0.22 to 10.0.30 an error occurred when build the project. I have installed Visual Studio 2017(Version 15.9.33) I have a single custom model which is integrated wi...
ParaschandraDave
Jan 31, 2023Copper Contributor
Please update the Finanace and Operations (Dyanmics 365) extension in Visual Studio with relevant D365 F&O version. It solves an issue for me. I have updated with version shown in below screenshot.
Visusal Studio D365 F&O extension version detail