Forum Discussion
MSohail2400
Jan 18, 2023Copper Contributor
Error On Build Project After Upgrading Finance & Operation Version Dynamic 365
After upgrading version from 10.0.22 to 10.0.30 an error occurred when build the project. I have installed Visual Studio 2017(Version 15.9.33) I have a single custom model which is integrated wi...
lakhvich
Oct 05, 2023Copper Contributor
Please find and install the specific version of the D365 extension from the deployable package folder for the current PU version.
(*K):\DeployablePackages\...
\\DevToolsService\Scripts\Microsoft.Dynamics.Framework.Tools.Installer.vsix
(*K):\DeployablePackages\...
\\DevToolsService\Scripts\Microsoft.Dynamics.Framework.Tools.Installer.vsix