How do I have the Numbers in the Green Move with the Dates
I I'm trying to have the numbers in the green or gray area change when the date changes. What formula should I use to achieve this? Please help.
Patrick2788
Jun 10, 2026Silver Contributor
Checking if a given date is between 2 days is straight forward. The part that's not clear is why the Gantt display shows certain numbers (1-4) and why Saturday is skipped for some assignments but not others.
parcuri
Jun 10, 2026Copper Contributor
Those numbers are manpower for those days on each assignment. those are the number i need to move with the dates in row 11 witch are based off 6G