Good Morning!

 

Need some help figuring out how to have these three columns show the end date of a project, soon as I input the NTP Start Date.

Example: NTP Date 10/01/2022 + Contract Period Date (60 Days) = Contract End Date 11/30/2022 

NTP  DateConst. Contract Period (Days)Contract Period End Date
10/01/20226011/30/2022

 

Thank you for any assistance. 

5 Replies

  • WMcDuff74 

    Let's say these are columns A, B and C.

    In C2:

     

    =IF(OR(A2="", B2=""), "", A2+B2)

     

    Fill down as far as you want. (If your data are in a table, the formula should be propagated down automatically)

    • WMcDuff74's avatar
      WMcDuff74
      Copper Contributor
      HansVogelaar
      My columns are H, I, J
      When I put your formula in it is thinking I want 60 days for all. What I am looking for is, whatever date is inputted in column H and whatever number is inputted in column I equal a the date I need the project completed by. Column H and I will always be different numbers.
      • HansVogelaar's avatar
        HansVogelaar
        MVP

        WMcDuff74 

        Make sure that Calculation Options on the Formulas tab of the ribbon is set to Automatic.

        Also make sure that the formula in J2 is

        =IF(OR(H2="", I2=""), "", H2+I2)

        without any $ in the formula, and that you have filled or copied it down from J2.