Forum Discussion
Goldridge
Mar 22, 2019Copper Contributor
Excel 2013 Date computation bug
Hi, I can't figure out what's the problem in this situation: When I calculate the sum of the time spent of the day, with those values: (see attachement) Start End Start End Total Fo...
- Mar 22, 2019
Goldridge , that is floating point calculation issue. In Excel one minute is 1/24/60, you calculate them as floating point numbers. To fix you may round the time to nearest second
=MROUND(F2-G2,"0:00:01")
SergeiBaklan
Mar 22, 2019Diamond Contributor
Goldridge , that is floating point calculation issue. In Excel one minute is 1/24/60, you calculate them as floating point numbers. To fix you may round the time to nearest second
=MROUND(F2-G2,"0:00:01")
- GoldridgeMar 26, 2019Copper Contributor
Thank you very much it solves that problem!
- SergeiBaklanMar 26, 2019Diamond Contributor
Goldridge , you are welcome