Forum Discussion
AKP_1
Apr 03, 2019Tin Contributor
Calculate a percentage increase that doesn't exceed 100%
Hello everyone, I am currently working on an occupancy rate up model. Here is the scenario I have a hotel with occupancy rate of 70% and ramp up 6 months I need to calculate the EOM o...
- Apr 03, 2019
Twifoo
Apr 03, 2019Silver Contributor
Based on your formula, the EOM occupancy rate will be limited to a maximum of 16.67%, which is 100%/6.