Forum Discussion
Icons Change Order After Renaming File (BUG)
I've notice since the last update that if I rename a file (usually a PDF) that the icons will reorder and the PDF/File I just renamed will be either at the top of the upper left column or the second icon in that column. This seems to happen almost always if the PDF being renamed is the bottom/last icon in the second column.
Two monitor setup w/ Primary on the Right side
Typical Win setup with Trash, This PC, etc. down the Left side
First & Second column are full when this happens, 3rd column is ~50% full
Rename the File icon and either hit Enter or Click in the open Desktop
Renamed File pops to the #1 or #2 position in the Left/First column
Lately I've been renaming a lot of PDFs, so this is where I'm seeing it, but don't think it matters
Edition Windows 11 Pro
Version 22H2
Installed on 10/5/2022
OS build 22621.1194
Experience Windows Feature Experience Pack 1000.22638.1000.0