Apr 05, 2020Brass Contributor
sharegate Jobs
Hello,
I am new to sharegate.
I have sharepoint 2010 application which contain 5 sites collection.
how many sharegate migration jobs we required for 5 sites..
I am assuming 1 job for each site collection, is my assumption is correct?
- Hi
If you find this post helpful and if you think it as a solution, please mark it for others to benefit from this posts.
7 Replies
- Sudharsan KSteel ContributorHi,
It's based on the size and performance of your server. But the best is to use 1 per site collection and running it simultaneously for the other site collections. You can run the migration parallel but it affects the performance of the source and the destination. My suggestion is to run 1 site collection at a time.- rautchetanBrass Contributor
so if I have 5 site collection , i need to create 5 jobs, is that correct?Sudharsan K
- Sudharsan KSteel ContributorHi,
Its based on how fast you need to complete the migration. Better migrate site collection 1 at a time to get a better performance and better results.
- rautchetanBrass Contributor
Thanks for sugegstionsSudharsan K