Forum Discussion
rautchetan
Apr 05, 2020Brass Contributor
sharegate Jobs
Hello, I am new to sharegate. I have sharepoint 2010 application which contain 5 sites collection. how many sharegate migration jobs we required for 5 sites.. I am assuming 1 job for each s...
- Apr 06, 2020Hi
If you find this post helpful and if you think it as a solution, please mark it for others to benefit from this posts.
Sudharsan K
Apr 06, 2020Steel Contributor
Hi,
My suggestion is to run the migration in real-time instead of scheduling in jobs, if you really want to schedule in jobs, the conditions are the same, schedule 1 job per site collection and run 1 job at a time. It is not the limitation of Sharegate but to maintain the migration more efficient, 1 job at a time should fit.
My suggestion is to run the migration in real-time instead of scheduling in jobs, if you really want to schedule in jobs, the conditions are the same, schedule 1 job per site collection and run 1 job at a time. It is not the limitation of Sharegate but to maintain the migration more efficient, 1 job at a time should fit.
Sudharsan K
Apr 06, 2020Steel Contributor
Hi
If you find this post helpful and if you think it as a solution, please mark it for others to benefit from this posts.
If you find this post helpful and if you think it as a solution, please mark it for others to benefit from this posts.