Forum Discussion
rautchetan
Apr 05, 2020Brass Contributor
sharegate Jobs
Hello, I am new to sharegate. I have sharepoint 2010 application which contain 5 sites collection. how many sharegate migration jobs we required for 5 sites.. I am assuming 1 job for each s...
- Apr 06, 2020Hi
If you find this post helpful and if you think it as a solution, please mark it for others to benefit from this posts.
Sudharsan K
Apr 05, 2020Steel Contributor
Hi,
It's based on the size and performance of your server. But the best is to use 1 per site collection and running it simultaneously for the other site collections. You can run the migration parallel but it affects the performance of the source and the destination. My suggestion is to run 1 site collection at a time.
It's based on the size and performance of your server. But the best is to use 1 per site collection and running it simultaneously for the other site collections. You can run the migration parallel but it affects the performance of the source and the destination. My suggestion is to run 1 site collection at a time.
- rautchetanApr 06, 2020Brass Contributor
so if I have 5 site collection , i need to create 5 jobs, is that correct?Sudharsan K
- Sudharsan KApr 06, 2020Steel ContributorHi,
Its based on how fast you need to complete the migration. Better migrate site collection 1 at a time to get a better performance and better results.- rautchetanApr 06, 2020Brass Contributor
sorry, but do we need 5 different jobs for 5 site collection or we can use same job for all 5 site collection Sudharsan K
- rautchetanApr 06, 2020Brass Contributor
Thanks for sugegstionsSudharsan K