Hello,
we are looking for a solution to add a Teams group to a project in "Project for the Web" with a flow.
In the web we have just to select the group and click on "Add" like in the screenshot:
Now we have a flow which creates a Teams team (it works fine) and we want to add the created team to a project in PftW.
We tried it with the standard Dataverse connectors but didnt find the correct field for this:
We also checked the new API: https://docs.microsoft.com/en-us/dynamics365/project-operations/project-management/schedule-api-preview
Is it possible to add a team to the project with a flow?
Thanks in advance
Elmir
24 Replies
- rsnttxCopper Contributor
Hello everyone, I know this topic is a bit old, but were you able to find a solution to the latency issue we encounter when linking a project to a group via Power Automate or with AZF?
- SamWhitehouseCopper ContributorHi elmirt/all,
I have written a blog on how you can achieve this using Power automate for you to use in your deployments.
https://www.linkedin.com/pulse/project-web-automate-microsoft-teams-association-sam-whitehouse-mllhe
Hope this helps :). Let me know if you have any feedback - PatrickGrebeTin Contributor
We have now solved the whole thing using an Azure Function (within a Logic App) and corresponding C# code.
We create a team and link it to an AAD group. The team is then assigned the appropriate security role. (https://docs.microsoft.com/en-us/dynamics365/customerengagement/on-premises/developer/org-service/sample-assign-record-new-owner?view=op-9-1)
var projectteam = new Entity("team", Guid.NewGuid()); projectteam["name"] = officeGroupName; projectteam["businessunitid"] = new EntityReference("businessunit",Guid.Parse("GUID_BUSINESSUNIT_HERE")); projectteam["azureactivedirectoryobjectid"] = officeGroupId; projectteam["teamtype"] = 3; projectteam["membershiptype"] = 0; projectteam.Id = crmServiceClient.Create(projectteam); // Add the role to the team. crmServiceClient.Associate( "team", projectteam.Id, new Relationship("teamroles_association"), new EntityReferenceCollection() { new EntityReference("role", Guid.Parse("SEC-ROLE-GUID-HERE")) });We then create the project with the API "msdyn_CreateProjectV1". Here we then set the "ownerid" to the ID of the created team.
project["ownerid"] = new EntityReference("team", Guid.Parse(projectteam.Id.ToString()));It takes some time until the connection is shown in P4W.
- gbartumeuBrass Contributor
Hello PatrickGrebe,
I use Power Automate to update the ownerid field from the entity msdyn_project with the teamid field located in the entity "Team" but it still does not update this change on Project for the web:
- PatrickGrebeTin ContributorI haven't tested this with a flow. However, the project creation should take place via an unbound action and the API "msdyn_CreateProjectV1". We do not update the ownerid, but maintain it directly when it is created. Here you can then set the "ownerid" directly to the team. As already mentioned, it takes 15-30 minutes before the connection is shown in P4W.
Important: If the team was newly created, a role must be added to it.
- PatrickGrebeTin Contributor
elmirt We are in the same situation. If you do this via the web interface, the "ownerid" and "owningteam" values are updated in the "msdyn_projects" entity.
The AAD group is then connected to a team (entity teams). If I do the whole thing via HTTP-PATCH, the attributes are also set accordingly, but the group is still not displayed as connected in the web interface. - FrederikBulllarsenCopper Contributor
elmirt Did you find a solution to this issue. We are also trying to find an automated way to integrate in teams.
- Anders_KjaerCopper Contributor
- gbartumeuBrass ContributorWe are in the same situation... Maybe the solution is in the entity called "msdyn_projectteamschannelmapping" or "msdyn_projectinternalconfiguration" or