Excel Risk Register I need the rating to calculate automatically
I have 2 columns with drop down tables. Risk Consequence
Likelihood
Depending on which are selected I need the third columns to calculate the RISK rating. See attached image. Anybody know what formula to use?
I’m desperate for help I’ve been trying for ages (-:
Likelihood
Depending on which are selected I need the third columns to calculate the RISK rating. See attached image. Anybody know what formula to use?
I’m desperate for help I’ve been trying for ages (-:
1 Reply
Hi Amandolim
I'd set it up like this (I've attached an example file)
Hope that helps
Wyn