Calculating cycle time based on different criteria
I am trying to use DAYS to calculate cycle time based on Job Type, which would be simple enough, but I'd like to use the IF(L2="","",....) to leave the cell blank if the cycle is not complete. If the...
- Nov 18, 2021
HansVogelaar
Nov 18, 2021MVP
Edg38426
Nov 18, 2021Brass Contributor
This worked quite well, thank you. I guess I should have avoided the DAYS formula altogether, eh?
- HansVogelaarNov 18, 2021MVP
- Edg38426Nov 18, 2021Brass ContributorSo what I'm seeing is that my issue was that I was trying to use two different job types in the formula, where I should have just been using one (if "Spec" then X, otherwise Y)
- HansVogelaarNov 18, 2021MVP
Yes, assuming that the job type will always be either Spec or Build.
On the other hand, it would be possible to do it like this:
=IF(L2="","",L2-IFS(C2="Spec",I2,C2="Build",F2))