I am trying to use DAYS to calculate cycle time based on Job Type, which would be simple enough, but I'd like to use the IF(L2="","",....) to leave the cell blank if the cycle is not complete. If the...
  • HansVogelaar's avatar
    Nov 18, 2021

    Edg38426 

    How about

     

    =IF(L2="","",L2-IF(C2="Spec",I2,F2))