Forum Discussion

Pete_Mc's avatar
Pete_Mc
Copper Contributor
Feb 02, 2023

Icons Change Order After Renaming File (BUG)

I've notice since the last update that if I rename a file (usually a PDF) that the icons will reorder and the PDF/File I just renamed will be either at the top of the upper left column or the second icon in that column.  This seems to happen almost always if the PDF being renamed is the bottom/last icon in the second column. 

 

Two monitor setup w/ Primary on the Right side

Typical Win setup with Trash, This PC, etc. down the Left side

First & Second column are full when this happens, 3rd column is ~50% full

Rename the File icon and either hit Enter or Click in the open Desktop

Renamed File pops to the #1 or #2 position in the Left/First column

Lately I've been renaming a lot of PDFs, so this is where I'm seeing it, but don't think it matters

 

 

Edition Windows 11 Pro
Version 22H2
Installed on ‎10/‎5/‎2022
OS build 22621.1194
Experience Windows Feature Experience Pack 1000.22638.1000.0

No RepliesBe the first to reply