Using a Calculated Value for a Date/Time Column in SP List
Hello SP Community, I'm trying to create a date/time column in a SP list using a calculated value. I would like to create an "Expiration Date" column (calculated value) by adding 3 months to "Dat...
- Aug 29, 2022
RLUGO I can't see anything wrong with your formula; this worked for me:
=DATE(YEAR([Insurance Expiry Date]),MONTH([Insurance Expiry Date])+Months,DAY([Insurance Expiry Date]))So what result are you getting?
Rob
Los Gallardos
Intranet, SharePoint and Power Platform Manager (and classic 1967 Morris Traveller driver)
RobElliott
Aug 29, 2022Silver Contributor
RLUGO no, it needs to be a calculated column. It won't work in the way you have done it with a date/time column.
Rob
Los Gallardos
Intranet, SharePoint and Power Platform Manager (and classic 1967 Morris Traveller driver)
RLUGO
Aug 29, 2022Copper Contributor
I understand now. Thank you for your help!