Forum Discussion
rbutgins21
Mar 04, 2021Brass Contributor
Power Automation
Is it possible to prevent a flow from starting if the prior instance of the same flow is still running?
1 Reply
- fabinkmCopper Contributor
you can set "concurrency control" in the settings of your trigger to "1".