POL 2,000 project site limit...
Hi Team
In POL if there is more than 2,000 projects, it is recommended to set up a separate project subsite. Is this a SP site or a MS Project site? I've thought it was a SP site but it doesn't seem to work.
Many thanks
James
Hi James_Price ,
There is a limit on 2,000 sub sites per site collection, this is a SharePoint Online site collection limit.
Once the PWA Site collection has 2,000 sub sites, if you want to create additional project sites, this is when you need to create a new SharePoint site collection (Not a PWA site collection) to host the additional project sites. Details can be seen here: https://learn.microsoft.com/en-us/ProjectOnline/tune-project-online-performance?redirectSourcePath=%252fen-us%252farticle%252fTune-Project-Online-performance-12ba0ebd-c616-42e5-b9b6-cad570e8409c#project-site-configuration
Worth noting is the lack of support for user permission sync with project sites hosted outside of the PWA site collection: https://learn.microsoft.com/en-us/ProjectOnline/tune-project-online-performance?redirectSourcePath=%252fen-us%252farticle%252fTune-Project-Online-performance-12ba0ebd-c616-42e5-b9b6-cad570e8409c#sync-user-permissionsHope that helps
Paul
6 Replies
Hi James_Price ,
There is a limit on 2,000 sub sites per site collection, this is a SharePoint Online site collection limit.
Once the PWA Site collection has 2,000 sub sites, if you want to create additional project sites, this is when you need to create a new SharePoint site collection (Not a PWA site collection) to host the additional project sites. Details can be seen here: https://learn.microsoft.com/en-us/ProjectOnline/tune-project-online-performance?redirectSourcePath=%252fen-us%252farticle%252fTune-Project-Online-performance-12ba0ebd-c616-42e5-b9b6-cad570e8409c#project-site-configuration
Worth noting is the lack of support for user permission sync with project sites hosted outside of the PWA site collection: https://learn.microsoft.com/en-us/ProjectOnline/tune-project-online-performance?redirectSourcePath=%252fen-us%252farticle%252fTune-Project-Online-performance-12ba0ebd-c616-42e5-b9b6-cad570e8409c#sync-user-permissionsHope that helps
Paul
- RodFrommSteel ContributorI believe there is more to it than that. If for every project you create there is a Project site created then the 2,000 limit comes into to play, but I have heard conflicting answers to this from Microsoft engineers. Personally, we have two sites that each have over 5,500 projects without any issues, but we also don't create Project sites for every project.
Hello RodFromm ,
The PWA Site collection can have 30,000 projects but only 2,000 of those projects could have a project site if you only used the PWA site collection to host project sites.
Paul
- James_PriceBrass Contributor
Hi RodFromm and Paul_Mather, FYI in the past I seen an instance where there were a total of 8,000 projects with about 3,500 sites in the pwa site and 4,500 in other subsites (long story). POL still seemed to function fine. But I was always worried it would slow to a standstill at any moment.
James