Change the group assigned to a project for the web?
Hi everyone!
I was wondering how can I change the group that I previously assign to the project. I assign the project incorrectly.
thanks in advance.
2 Replies
- JerryHendricksonBrass Contributor
gteibo1 I'm having same problem. Did you get an answer from anyone else? Thx.
- SteveK1080Copper Contributor
I've had the same problem, you can only copy the project in project for the web, assign the copy to the correct group and then delete the original.