Change the group assigned to a project for the web?
Hi everyone! I was wondering how can I change the group that I previously assign to the project. I assign the project incorrectly. thanks in advance.
JerryHendrickson
Jan 25, 2021Brass Contributor
gteibo1 I'm having same problem. Did you get an answer from anyone else? Thx.
SteveK1080
Jul 04, 2023Copper Contributor
I've had the same problem, you can only copy the project in project for the web, assign the copy to the correct group and then delete the original.