Forum Discussion

Kerry7777's avatar
Kerry7777
Copper Contributor
Jan 04, 2024
Solved

Apply motion or animation in Microsoft Designer?

I created a party invite for my boy's 5th birthday party. When I go to download the image I get a suggestion 'Ask Designer to animate your designs'.
How do you do this?
All my internet searching is coming up blank or leads to PowerPoint references.
I noticed in (second image below) one video on YouTube it shows an option to save as GIF but I don't see that option when I download my image.

7 Replies

Replies have been turned off for this discussion
  • Kerry7777's avatar
    Kerry7777
    Copper Contributor

    Kerry7777 

    I haven't found a proper answer to animate my existing static design.
    I was able to get some basic animations working by starting with one of the base 'Designer templates' (with animations) then replacing with my background image and copy pasting text elements from other base templates. Average outcome for me, interface and functionality needs work Microsoft.

    File size is big also. Shrunk the canvas size to 600px square but that didn't make much difference (still 1MB, file-name.mp4, 7 second duration). GIF output is very slow to compute/download and much bigger file size (7.1MB).


    • John-project's avatar
      John-project
      Silver Contributor
      Kerry7777,
      Cute, but you have posted to the wrong forum. This forum is dedicated to questions/issues with Microsoft Project, a project management application. I suggest you find a more appropriate forum for you issue.
      John
      • Kerry7777's avatar
        Kerry7777
        Copper Contributor

        John-project 

        Oh, my bad. Totally unrelated then. Would you happen to know the address of the correct forum please?
        Thank you