Forum Discussion
Hosnkobf
Jan 31, 2019Brass Contributor
Feature Request: Connect Bucket with Status
We are currently using planner for having an overview about evaluating a product (so the task describe a feature we would like to have in the product and we want to find out if it exist / is possible).
We would like to have a simple kanban board with four buckets:
- To do
- In Progress
- Works
- Does Not work
Now it would be awesome, if we had the ability to connect the buckets with the status of the tickets.
So, when somebody drags a ticket to "In Progress", the tasks progress is automatically changed to "In progress".
And if somebody drags it to "Works" or "Does Not Work", the task is automatically marked as "Completed".
In addition it would be nice to have an option "Keep previous status" for a bucket, so that it is not reverted to "Not started" when moved.
Hi Adam,
thanks for pointing me to the right side... I was already guessing that I am wrong here ;)
I found a ticket which pretty much describes the feature I want: https://planner.uservoice.com/forums/330525-microsoft-planner-feedback-forum/suggestions/15101319-change-task-status-when-moved-to-specific-column
- Please post this on uservoice for people to vote for this feature!
https://planner.uservoice.com/forums/330525-microsoft-planner-feedback-forum
I’m also thinking flow! You can change status today with flow on tasks but I don’t think there is anyway to “catch” the bucket switching though as a trigger
Adam- HosnkobfBrass Contributor
Hi Adam,
thanks for pointing me to the right side... I was already guessing that I am wrong here ;)
I found a ticket which pretty much describes the feature I want: https://planner.uservoice.com/forums/330525-microsoft-planner-feedback-forum/suggestions/15101319-change-task-status-when-moved-to-specific-column
- Jennifer_King_jjhallCopper Contributor
Hosnkobf i am still interested in an answer to your original question. did you find an answer for this problem?