Forum Discussion
Hosnkobf
Jan 31, 2019Brass Contributor
Feature Request: Connect Bucket with Status
We are currently using planner for having an overview about evaluating a product (so the task describe a feature we would like to have in the product and we want to find out if it exist / is possible...
- Jan 31, 2019
Hi Adam,
thanks for pointing me to the right side... I was already guessing that I am wrong here ;)
I found a ticket which pretty much describes the feature I want: https://planner.uservoice.com/forums/330525-microsoft-planner-feedback-forum/suggestions/15101319-change-task-status-when-moved-to-specific-column
Hosnkobf
Jan 31, 2019Brass Contributor
Hi Adam,
thanks for pointing me to the right side... I was already guessing that I am wrong here ;)
I found a ticket which pretty much describes the feature I want: https://planner.uservoice.com/forums/330525-microsoft-planner-feedback-forum/suggestions/15101319-change-task-status-when-moved-to-specific-column
Jennifer_King_jjhall
Oct 17, 2024Copper Contributor
Hosnkobf i am still interested in an answer to your original question. did you find an answer for this problem?