Forum Discussion

Shoekstra's avatar
Shoekstra
Copper Contributor
Jun 15, 2023

Question based on previous answer?

Hey so I have a simple form with 2 questions

 

in the first one they can select a month (jan, feb, mar, etc) and in the second one they have to type in a year number.

 

Now this form is linked to several power automate flows and I wanna build in some form of double checking their answers, like a pop up or a third question that says "are you sure you want to start the flow for month X in year X" - where they can mark a checkbox

 

Basically i want the confirmation question to contain the answers selected in question 1 and 2 so the users can double-check (or if anyone has a better solution for this, any info is welcome)

 

I know about branching but I don't know how to properly do it besides making like 100+ branches for every month/year combination possible.

  • Shoekstra 

     

    Branching would be a good approach for your scenario. If possible, we could add a required confirmation question for each question, which would significantly reduce the number of questions you need to build. It would look something like this:

     

  • RobElliott's avatar
    RobElliott
    Silver Contributor

    Shoekstra you can't copy the answers from previous questions to a new question, there is NO pre-filling of questions in Forms.

     

    Rob
    Los Gallardos
    Intranet, SharePoint and Power Platform Manager (and classic 1967 Morris Traveller driver)

Resources