Forum Discussion
No copying existing plans in new Planner?
In the old Planner I could copy an entire Plan en reuse it with new dates and everything. In the new Planner I can't seem to find a possibility to copy an existing plan. I'm at a total loss here... am I supposed to create a new plan similar to earlier plans every time? How is this feature removed? Anyone any ideas where to find it?
4 Replies
- dcumin39Copper Contributor
Also cannot find this option. Going to recommend my company moves back to trello which is included in our atlassian subscription. They have the option to copy there. Assume a lot of companies have both microsoft and atlassian so seems like the best option.
- GS_RFCopper Contributor
I've found that when I copy a plan now it strips out the labels and task descriptions - there surely must be a way to copy the whole plan as previously?
Try this:
- Go to the Planner Hub: Open Planner from the Microsoft 365 portal.
- Select the Plan: Click on the plan you want to copy.
- Click on the Three Dots: In the top right corner of the plan, click on the three dots (ellipsis) menu.
- Choose "Copy Plan": From the dropdown menu, select "Copy Plan".
- Sanneke73Copper Contributor
Unfortunately, this was the way to do it in the old Planner. That's not possible anymore. I just found it is only possible to copy a plan if you share it with a group. Then you can go to the menu (arrow) next to the name where you find 'Copy plan'. It is no longer possible from My Plans (the old Hub).