Forum Discussion
Excel Chart
Thank For reply ,i have 10 machines in factory ,i have data per shift ( 3 shifts x 8 hours daily) for every machine like when machine in breakdown for specific issue (from 11:00 pm to 1:00 am as example) and what done to fix the problem and who worked in that time . machine normally stopped per day 2 or 3 times in average 10 to 120 minutes for every time daily .
i need just visualize stoppages in horizontal steps for during 24 hours
and in vertical line machine number or machine name .
- Ahmed_Moharam1969Jul 04, 2022Copper Contributorappreciate your help.
- mathetesJul 08, 2022Silver Contributor
I'm on vacation this week, and so don't really have time to devote to your task. Perhaps somebody else could.
What you've shown us, though, makes me wonder why your very first image (of what I assume is the "raw data") isn't sufficient in itself, especially if sorted in order by machine. All of the information would then be there, and color coding (conditional formatting, automatic) could be used, to indicated whether running or shut down. One thing you'd need to add is some descriptive code; you appear to be using color right now, but don't indicate how that is applied.
So let me ask those two questions very specifically:
- How do you code or mark the status of the machine? Are there subsets--especially for when it's not running (to indicate different reasons, perhaps, such as mechanical difficulties vs manpower shortages, etc)?
- If that table could be sorted in order by machine (and time slots) would that be sufficient to meet your needs? If not, why not?
- Ahmed_Moharam1969Jul 09, 2022Copper Contributor
First of All, thanks for your support and enjoy your vacation.
please find my below respond your question.
How do you code or mark the status of the machine? Are there subsets--especially for when it's not running (to indicate different reasons, perhaps, such as mechanical difficulties vs manpower shortages, etc)? running time white, mechanical breakdown green, electrical breakdown yellow, not planned time to run blue.
If that table could be sorted in order by machine (and time slots) would that be sufficient to meet your needs? If not, why not? This table and chart are okay in my photos but only I faced one problem couldn’t solve that If same machine stop for breakdown for second or third time come in chart in different bar below first one but I need to illustrate only one horizontal bar per machine showing different times of breakdowns happened on 24 hours.
Thanks ,
- Ahmed_Moharam1969Jul 04, 2022Copper Contributorthe graph to be appeared 10 horizontal stacked bar for 10 machines . each Bar length is 24 hours (24 portions) some of portions colored red in some area illustrate machine stop times by day