Hi, everyone: I am new to Power Query and not sure why it is taking hours to execute the code below. Because the data is sensitive, I am unable to share the file. However, I can say that the fi...
Cindysc1218
May 27, 2022Copper Contributor
So that second step was something I had to research to find out how to do something I need.
What I need to do is merge (left join) two tables using account and the dates as my primary keys. I understand I do an exact match on accounts to merge the tables, but I cannot do an exact match on dates which is why I am attempting to match when Ship Date is either within 30 days before or 30 days after the Post Date. After spending much time online, the code in step 2 appears to do what I need to do. Are you saying that your solution can do that the same thing?
What I need to do is merge (left join) two tables using account and the dates as my primary keys. I understand I do an exact match on accounts to merge the tables, but I cannot do an exact match on dates which is why I am attempting to match when Ship Date is either within 30 days before or 30 days after the Post Date. After spending much time online, the code in step 2 appears to do what I need to do. Are you saying that your solution can do that the same thing?
Cindysc1218
May 27, 2022Copper Contributor
This is also a one-to-many join.