I have a sheet that receives all the inputs for our production including time started and time finished. The times inserted can be from one day to the next. I have not been able to subtract the ...
- Sep 15, 2020
I agree with Riny_van_Eekelen
The safest option is to include the dates in the calculation of elapsed time
= (endDate+endTime) - (startDate+startTime) = MOD(endTime -startTime, 1)
The second option is only usable if you are certain the elapsed time will never exceed 24hrs.
The number format you require is [h]:mm unless you choose to multiply by 24 and output the result as decimal hours, in which case it would be 0.0 "hours" .
The ranges defined for your dried weight calculations are incorrect and include the total itself, so giving rise to circular references.
Sockens
Sep 14, 2020Copper Contributor
Riny_van_Eekelen
Sep 15, 2020Platinum Contributor
Sockens Since you already have the dates in your schedule in C1 and D1, why not simply use
=(D1+D5)-(C1+C4)
and custom format as [h]:mm, just to be sure to calculate duration in stead of time. Result will be 15:10