importing project into power BI

Occasional Contributor

Hi, I

My company never saw the benefit to switch to project online so i am using the standard version:

I am trying to analyse project data by exporting to access DB (.mbd format) and importing to power

BI.

A lot of redundant tables are brought in and was i wondering if anyone had cracked how to re-build the model in powerBI ?

 

0 Replies