Deploying Project 2016 C2R (Insider) on Terminal Server doesn't show new features
Hi Brian-Smith,
Sorry to bother you again with the topic. I created the ticket last week but received so far no initial call nor initial email from the engineer assigned. Instead it says in the Admin portal, that an engineer is reviewing the case. Is this a normal delay?
Therefore I tried the installation on a second Terminal Server with the same results. I used the same configuration file (except for the sharing property) on a Win 10 VM and it worked without issues.
Kind regards,
Trutz
Ping me the case number at brian.smith@microsoft.com and I'll see if I can trace where it got to Trutz.
Sorry for the runaround you are getting here.
Best regards,
Brian.
- Trutz_StephaniDec 05, 2017Steel Contributor
At the end, the case was closed as the behavior is currently "by design" for terminal services environments, on which Project is installed using the "SharedLicensing" setting in the Office deployment tool.
I was asked to create a UserVoice entry, which I did: