Hi Everyone,
Please I need help I created A nonconformity Report SharePoint list and Corrective Action List and the flow I created is as:
1- When any new item created in the nonconformity Report SharePoint list, create anew Item with the same title in the Corrective Action List and add link to its related item in the nonconformity Report SharePoint list (this flow works fine)
2- when item is created in Corrective Action List I need to update its related Item in the nonconformity Report by adding the link to item to Corrective Action List. but when I added update Item action here in the flow it is get the link to Corrective Action List but it creates a new item.
Apr 06 2020 06:25 PM
Apr 07 2020 04:16 AM
Apr 08 2020 01:24 AM
@Sudharsan K Thanks a lot but I'm beginner in use Microsoft Flow could you please guide me how to do this action
do you mean this action:
Apr 08 2020 04:42 AM
Apr 12 2020 05:57 AM
@Sudharsan K Thanks a lot I tried to track your suggested method but it seems I don't have HTTP in my company package we need tp upgrade in addition I cannot understand how this can help in my case.
I'm stacked in this for weeks, please your support I need to add flow to do following:
1- When Non conformity Created in List A it creates anew Task in List B and attche link to list A in the related to field so the user can back easily to List A. (This flow work fine with me)
2- When the new item saved in list A, update the item prosperities related to field to get the link to List B new item.
Note: Every Non Conformity has one Task and the objectives fro related to link is to navigate easily between List A and List B Items.
Apr 12 2020 08:19 AM
@Ghada Mehrez the action referred to earlier is not one of the premium ones which you included in your screenshot but the free one "Send an HTTP request to SharePoint":
Rob
Los Gallardos
Microsoft Power Automate Community Super User
Apr 12 2020 11:53 AM
SolutionThanks for the additional explanation. If I am understanding you correctly, this should be fairly simple to do. I understand you to say that when an item is created in List A, then a task should be created in Task List B with a link back to the new item in List A, and also the RelatedTo field in that new item should be updated to contain a link to the new task in List B. Is that correct? If so, please see the following flow, which does that using basic actions.
Overview (trigger + 2 actions):
Detail of creating an item in the Task List, including a link to the new item which triggered the flow. You probably already figured out that the name of your task list must be entered manually as it's not listed by default under List Name.
Detail of updating the original item in List A to add a link to the task just created in the Task List. ID and Title are from the trigger item (When item is created), and RelatedTo is the Link to Item from the step just above (Create new item).
Does this do what you want...?
Sandy
Apr 13 2020 02:58 AM
@Sandy Ussia Thanks a lot this is what exactly what I want to implement but when I do this steps it updates the Item but the link to item refer to List A not List B
in addition it creates anew list Item with the right link to Item (refer to list B)
I cannot figure what is the error
Screenshot of List A
Apr 12 2020 11:53 AM
SolutionThanks for the additional explanation. If I am understanding you correctly, this should be fairly simple to do. I understand you to say that when an item is created in List A, then a task should be created in Task List B with a link back to the new item in List A, and also the RelatedTo field in that new item should be updated to contain a link to the new task in List B. Is that correct? If so, please see the following flow, which does that using basic actions.
Overview (trigger + 2 actions):
Detail of creating an item in the Task List, including a link to the new item which triggered the flow. You probably already figured out that the name of your task list must be entered manually as it's not listed by default under List Name.
Detail of updating the original item in List A to add a link to the task just created in the Task List. ID and Title are from the trigger item (When item is created), and RelatedTo is the Link to Item from the step just above (Create new item).
Does this do what you want...?