How to automate Planner and integrate it with Power Bi

%3CLINGO-SUB%20id%3D%22lingo-sub-143498%22%20slang%3D%22en-US%22%3EHow%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-143498%22%20slang%3D%22en-US%22%3E%3CP%3ELets%20say%20on%20my%20work%20i%20have%20to%20do%20the%20same%20exact%20activities%2C%20one%20after%20another%20and%20my%20boss%20wants%20to%20assign%20those%20tasks%20to%20my%20team%20through%20Microsoft%26nbsp%3BTeams%2C%20how%20can%20i%20make%20like%20a%20sample%20tasks%20that%20i%20just%20change%20the%20name%20but%20the%20check%20list%20is%20the%20same%20and%20that%20those%20tasks%20are%20linked%20one%20after%20another.%3CBR%20%2F%3E%3CBR%20%2F%3EBesides%20that%20I%20want%20to%20know%20if%20its%20possible%20to%20graph%20how%20much%20time%20it%20takes%20me%20to%20complete%20those%20tasks%20using%20Power%20Bi%20or%20any%20other%20application%20from%20Office%26nbsp%3B365.%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EThanks%20for%20your%20time%20and%20help.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-143498%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EDeveloper%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EOffice%20365%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EPlanner%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EUser%20Adoption%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E%3CLINGO-SUB%20id%3D%22lingo-sub-310325%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-310325%22%20slang%3D%22en-US%22%3E%3CP%3EI%20agree%20about%20using%20Flow%20to%20export%20data%20to%20SharePoint%20lists.%20I%20find%20that%20helpful%20for%20SCRUM%20teams%20that%20want%20to%20use%20Planner.%20There%20are%20some%20frustrations%20with%20that%20though%2C%20as%20not%20all%20the%20Planner%20fields%20are%20available%20to%20Flow%20(specifically%2C%20the%20multi-value%20fields%20like%20labels%20and%20checklist).%20If%20those%20aren't%20important%20to%20you%2C%20then%20that'll%20do%20fine.%20I'm%20curious%20how%20you'd%20measure%20the%20duration%20of%20a%20Planner%20task.%20In%20many%20cases%2C%20I%20find%20that%20tasks%20are%20created%20%2F%20staged%20well%20in%20advance%20of%26nbsp%3Bwhen%20they're%20going%20to%20be%20worked%20on.%20Would%20you%20try%20to%20look%20at%20the%20Planner%20'created'%26nbsp%3B%20value%2C%20or%20would%20you%20push%20things%20to%20SharePoint%20frequently%20as%20they're%20moved%20to%20'In%20Progress'%20and%20then%20look%20at%20the%20SharePoint%20created%20date%3F%20Just%20thinking%20out%20loud%20-%20I%20don't%20have%20a%20well%20thought%20out%20recommendation%20for%20this.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EHere's%20an%20answer%20for%20the%20'clone%20tasks'%20part%20of%20your%20question.%20You%20can%20do%20use%20the%20'copy%20task'%20menu%20command%20for%20this.%20Either%20copy%20a%20completed%20task%20or%20setup%20some%20dummy%20tasks%20with%20generic%20names%20in%20a%20separate%20bucket.%20Then%20move%20the%20copies%20to%20whatever%20bucket%20you%20want%20for%20tracking.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20332px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F64905iCE3DD92A44881857%2Fimage-dimensions%2F332x261%3Fv%3D1.0%22%20width%3D%22332%22%20height%3D%22261%22%20alt%3D%22plannerCopyTask.png%22%20title%3D%22plannerCopyTask.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-310230%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-310230%22%20slang%3D%22en-US%22%3E%3CP%3EI've%20seen%20this%20online%2C%20seems%20to%20cover%20off%20what%20you're%20looking%20for%3C%2FP%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Fblogs.msdn.microsoft.com%2Fbrismith%2F2017%2F08%2F11%2Fmicrosoft-planner-considerations-for-reporting-part-2%2F%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fblogs.msdn.microsoft.com%2Fbrismith%2F2017%2F08%2F11%2Fmicrosoft-planner-considerations-for-reporting-part-2%2F%3C%2FA%3E%3C%2FP%3E%3CP%3EOriginally%20taken%20from%3C%2FP%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Fcommunity.powerbi.com%2Ft5%2FIntegrations-with-Files-and%2FHow-do-I-do-Power-BI-amp-Microsoft-Planner-integration-for%2Ftd-p%2F361495%22%20target%3D%22_blank%22%20rel%3D%22nofollow%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fcommunity.powerbi.com%2Ft5%2FIntegrations-with-Files-and%2FHow-do-I-do-Power-BI-amp-Microsoft-Planner-integration-for%2Ftd-p%2F361495%3C%2FA%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-293006%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-293006%22%20slang%3D%22en-US%22%3E%3CP%3EHim%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ECan%20you%20share%20how%20you%20did%20it%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3Eregards%2C%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-291560%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-291560%22%20slang%3D%22en-US%22%3E%3CP%3ECan%20you%20please%20advise%20how%20you%20configured%20your%20Flow%20for%20this%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-278005%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-278005%22%20slang%3D%22en-US%22%3E%3CP%3EDean%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ECould%20you%20demonstrate%20how%3F%26nbsp%3BI%20tried%20several%20ways%2C%20but%20I%20could%20not.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EBest%20regards.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-251251%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-251251%22%20slang%3D%22en-US%22%3E%3CP%3EI%20mean%2C%20for%20the%20Flow%20part.%3CBR%20%2F%3EI%20was%20wondering%20how%20to%20handle%20new%20items%2C%20updated%20items%2C%20deleted%20items%20as%20well%20as%20adressing%20properly%20sharepoint.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-251249%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-251249%22%20slang%3D%22en-US%22%3E%3CP%3EThat%20seems%20doable%20indeed.%3C%2FP%3E%3CP%3EDo%20you%20have%20any%20documentation%20how%20you%20did%20it%3F%3C%2FP%3E%3CP%3EThanks%20in%20advance.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-250872%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-250872%22%20slang%3D%22en-US%22%3E%3CP%3EYou%20can%20achieve%20this%20using%20Flow.%26nbsp%3B%20Use%20Flow%20to%20push%20the%20data%20from%20Planner%20into%20SharePoint%20lists%20(one%20for%20plans%2C%20one%20for%20boards%20and%20another%20for%20tasks)%20-%20then%20report%20in%20Power%20BI%20on%20those%20lists.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThis%20works%20fine%20for%20me%20-%20and%20I%20have%20a%20scheduled%20timer%20trigger%20updating%20every%2030%20mins%20so%20the%20reports%20are%20up%20to%20date%20at%20all%20times.%26nbsp%3B%20Just%20remember%20to%20pull%20in%203%20lists%20and%20reference%20them%20in%20your%20model%20and%20it%20works%20fine.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EHope%20this%20helps.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-193830%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-193830%22%20slang%3D%22en-US%22%3EYou%20need%20to%20export%20the%20Planner%20data%20to%20SharePoint%20or%20OneDrive%20so%20you%20can%20establish%20it%20with%20PowerBI%20dashboard.%20However%20there%20is%20no%20direct%20way%20as%20of%20now%2C%20you%20need%20to%20depend%20on%20third%20party%20apps%20for%20now%2C%20to%20export%20the%20Planner%20data%20to%20Excel%20in%20regular%20intervals%20so%20the%20PowerBI%20dashboard%20will%20be%20automatically%20refreshed.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-193811%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-193811%22%20slang%3D%22en-US%22%3EI%20would%20like%20to%20have%20access%20to%20planner%20data's%20from%20within%20PowerBI.%3CBR%20%2F%3EIndeed%2C%20I%20would%20like%20to%20manage%20my%20teams%20achievements%2C%20risks%20and%20issues%20on%20a%20regular%20basis%2C%20in%20order%20to%20promote%20the%20tasks%20we%20fulfill.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-143580%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-143580%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Fyoutu.be%2F1uBmWkjMW5A%3Ft%3D449%26nbsp%3B%22%20target%3D%22_blank%22%20rel%3D%22nofollow%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fyoutu.be%2F1uBmWkjMW5A%3Ft%3D449%26nbsp%3B%3C%2FA%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EI%20add%20you%20a%20link%20of%20something%20I%20saw%20on%20Youtube%20about%20using%20Microsoft%20Flow%2C%20isn't%20it%20suppose%20that%20if%20I%20modify%20my%20activities%20on%20planner%20%2C%20they%20would%20update%20on%20teams%3F%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-143562%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-143562%22%20slang%3D%22en-US%22%3EPlanner%20does%20not%20provide%20the%20ability%20to%20link%20Tasks%20as%20you%20can%20do%20with%20Project%20online%20and%20at%20the%20moment%20there%20is%20not%20way%20to%20obtain%20how%20much%20time%20is%20taking%20to%20complete%20a%20task%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-698679%22%20slang%3D%22en-US%22%3ERe%3A%20How%20to%20automate%20Planner%20and%20integrate%20it%20with%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-698679%22%20slang%3D%22en-US%22%3EJust%20what%20I%20was%20looking%20for!%20Thanks!%3C%2FLINGO-BODY%3E
JOSE ANGEL HINOJOSA
New Contributor

Lets say on my work i have to do the same exact activities, one after another and my boss wants to assign those tasks to my team through Microsoft Teams, how can i make like a sample tasks that i just change the name but the check list is the same and that those tasks are linked one after another.

Besides that I want to know if its possible to graph how much time it takes me to complete those tasks using Power Bi or any other application from Office 365. 

 

Thanks for your time and help.

13 Replies
Highlighted
Planner does not provide the ability to link Tasks as you can do with Project online and at the moment there is not way to obtain how much time is taking to complete a task
Highlighted

https://youtu.be/1uBmWkjMW5A?t=449 

 

I add you a link of something I saw on Youtube about using Microsoft Flow, isn't it suppose that if I modify my activities on planner , they would update on teams?

 

A look at the recent updates to Microsoft Planner including the updated look and feel, as well as faster web interface, deeper integration with Office 365 ap...
Highlighted
I would like to have access to planner data's from within PowerBI.
Indeed, I would like to manage my teams achievements, risks and issues on a regular basis, in order to promote the tasks we fulfill.
Highlighted
You need to export the Planner data to SharePoint or OneDrive so you can establish it with PowerBI dashboard. However there is no direct way as of now, you need to depend on third party apps for now, to export the Planner data to Excel in regular intervals so the PowerBI dashboard will be automatically refreshed.
Highlighted

You can achieve this using Flow.  Use Flow to push the data from Planner into SharePoint lists (one for plans, one for boards and another for tasks) - then report in Power BI on those lists.

 

This works fine for me - and I have a scheduled timer trigger updating every 30 mins so the reports are up to date at all times.  Just remember to pull in 3 lists and reference them in your model and it works fine.

 

Hope this helps.

Highlighted

That seems doable indeed.

Do you have any documentation how you did it?

Thanks in advance.

Highlighted

I mean, for the Flow part.
I was wondering how to handle new items, updated items, deleted items as well as adressing properly sharepoint.

Highlighted

Dean,

 

Could you demonstrate how? I tried several ways, but I could not.

 

Best regards.

Highlighted

Can you please advise how you configured your Flow for this?

Highlighted

Him 

 

Can you share how you did it?

 

regards, 

Highlighted

I agree about using Flow to export data to SharePoint lists. I find that helpful for SCRUM teams that want to use Planner. There are some frustrations with that though, as not all the Planner fields are available to Flow (specifically, the multi-value fields like labels and checklist). If those aren't important to you, then that'll do fine. I'm curious how you'd measure the duration of a Planner task. In many cases, I find that tasks are created / staged well in advance of when they're going to be worked on. Would you try to look at the Planner 'created'  value, or would you push things to SharePoint frequently as they're moved to 'In Progress' and then look at the SharePoint created date? Just thinking out loud - I don't have a well thought out recommendation for this.

 

Here's an answer for the 'clone tasks' part of your question. You can do use the 'copy task' menu command for this. Either copy a completed task or setup some dummy tasks with generic names in a separate bucket. Then move the copies to whatever bucket you want for tracking.

 

plannerCopyTask.png

Highlighted
Just what I was looking for! Thanks!
Related Conversations
Adding users to O365 Groups with AD/AAD Groups
Pekka Karppinen in Office 365 on
1 Replies
Suggestion for improved Planner Integration
Clayton12S in Microsoft Teams on
1 Replies
MS Planner notifications (e-mail and push)
Mavo145 in Planner on
3 Replies
Planner tasks in To-Do - Folders organisation
APK91 in Microsoft To Do on
1 Replies
Microsoft Planner Task Comments Suddenly Disappear.
afzaalhussain in Planner on
4 Replies