Forum Discussion
Irene2023
Apr 12, 2023Copper Contributor
Workflow manager configuration error: Object reference not set to an instance of an object
Hi, I'm trying to install and configure workflow manager in sharepoint with pwa 2019 on-prem, however am getting the following error Object reference not set to an instance of an object (see the ...
Suryakantadas
Apr 16, 2023Copper Contributor
Irene2023 Install Microsoft service Fabric and Vcredist64 and try.. You will get into.. I also faced same issue aftder installing these both file I am able to proceed.