Forum Discussion
Tania-Menlo
Jan 30, 2022Copper Contributor
Why does Project still not have a Spell Checker?
I've been using MS Project since 1990 - yep, that far back, and it amazes me that it still does not have a spell checking facility! Especially when I look at how many people in the construction indu...
Mar 21, 2022
Tania --
There is a Spelling button at the right end of the Project ribbon. When you click it, the spell checker shows you each misspelled word, with the option to ignore it or change it. If you are looking for automatic spell checking which highlights potentially misspelled words, that feature does not exist in Microsoft Project, and probably never will. Hope this helps.
There is a Spelling button at the right end of the Project ribbon. When you click it, the spell checker shows you each misspelled word, with the option to ignore it or change it. If you are looking for automatic spell checking which highlights potentially misspelled words, that feature does not exist in Microsoft Project, and probably never will. Hope this helps.
- John-projectMar 21, 2022Silver ContributorDale,
How blind am I. I must have seen that icon hundreds of times but never gave it a look, too focused on other stuff I guess. Thanks for jumping in with your savvy.
John