Forum Discussion

ErikB2240's avatar
ErikB2240
Copper Contributor
Jul 12, 2022

When importing CSV data POL does not pick up data for a field which is a drop down list

Hey,

 

I am trying to import data to POL through a CSV file. One of the fields I want to import is HW_SW. In POL this is a drop down list which contains the value 'HW', 'SW', 'HW/SW' and a few others. When I try to import it using the wizard I can see that it selects the correct MicroSoft Project Field, and in the preview I can see the data correctly. 

However when I check the data in POL the column remains empty.

What could be the cause of this and how can it be fixed?

 

Thanks in advance,

Erik

 

1 Reply

  • John-project's avatar
    John-project
    Silver Contributor
    Erik,
    There is no "drop down" in the text file so you must have set up the Project field as a drop down. I suspect when you created the custom field in Project as a lookup table, you did not check the option to "allow additional items to be entered into the field".

    Set that option and see if it works now.
    John