Forum Discussion
This project contains links to one or more data sources
- Nov 09, 2021
Apparently at some point you or someone else created imbedded links to the Project file. It could have been a hyperlink, the file was part of a master/subproject structure, a resource pool/sharer structure, or had cross-project links to another file, or perhaps had an imbedded image. Lots of possibilities.
Also, the fact that your file is also much larger than your other similar files indicates there may be corruption. I suggest you try each of the methods in the following Wiki article.
John
I never experienced that issue and I've been using Project for over 20 years, many versions. Did you look at the Wiki article I suggested?
For reference, what version of Project are you using?
John
I'm using Online Desktop Client MSO Version 2111 Build 16.0.14701.20206 64 bit (Click-to-Run) which was installed from O365.
- Don_ClickDec 08, 2021Copper Contributor
As an FYI, I tried method 2 and I no longer have the popup about the link(s). I lost quite all the formatting as was mentioned and I had some graphical representations of some numbered fields that I had to redo. All in all, it didn't take too long. So, the file for this project seems to be working. Thanks for the push to try one of the methods.
- John-projectDec 08, 2021Silver ContributorDon,
You're welcome and thanks for the feedback. If I answered your question please consider marking my response as the answer.
John