Forum Discussion
Ashina09
Jul 13, 2022Copper Contributor
Save Project Baseline in PWA using Power Automate
Hello
How to save a baseline of a project file inside Project Online using Power Automate? I want to create a REST API of Power Automate flow which will perform saving the baseline.
Thanks in advance for any tips
No RepliesBe the first to reply